Search

Discover resources from Halliburton

Showing 1-10 of 228 results

Results per page: 102550
Filtered results

Case Study

Reliable reservoir measurements save operator USD 1 MM

GeoTap sensor acquires accurate and precise formation pressure data in real time, eliminating the need for wireline operations and saving two days of rig time.

Brochure

Conformance product portfolio - Brochure

Conformance technology is the application of processes to reservoirs and boreholes to help reduce the production of unwanted water and/or gas

Case Study

Operator sets benchmark drilling long lateral s-shape well

Cruzer™ Depth of Cut in Russia generates a rolling element to increase the ROP and improve geosteering control in order to reach total depth in one run.

Case Study

LCM blend helps operator minimize losses in PP/FG condition

Discover how Halliburton Baroid solution helps save three days of rig time, while also significantly reducing fluid costs in deepwater Gulf of Mexico.

Data Sheet

GasFact™ Extraction Efficiency Correction - Data Sheet

Determine true reservoir gas data with enhanced gas extraction.

Data Sheet

DataSphere® array system - Data sheet

The DataSphere® Array system, a reliable multi-point reservoir monitoring, is the next step in the evolution of DataSphere permanent monitoring suite

Data Sheet

Obsidian® Bridge Plug

The Obsidian bridge plug is designed to isolate perforated intervals or portions of a wellbore. The unique material and ease of drilling makes the Obsidian bridge plug ideal for horizontal applications

Data Sheet

Design at the Customer Interface (DatCI) - Data sheet

DatCI isn’t only about having technical experts interfacing with the customer, it is about arming the organization to be able to deliver optimized solutions

Case Study

DuraHard™ coatings triple pump run life in harsh conditions

Discover how the use of Halliburton's DuraHard™ coating results in fewer workovers, saving an estimated USD $170,000 per well plus non-productive time.

Case Study

Dual drilling operations saves Aker BP USD 1.2 million

Discover how Halliburton Sperry Drilling's management of three simultaneous dual drilling operations reduce overall well time and attain world-first record.

Results per page: 102550