Search

Discover resources from Halliburton

Showing 1-10 of 228 results

Results per page: 102550
Filtered results

Case Study

CoreVault produces conclusive analysis for economic decision

Halliburton's CoreVault RFP System delivered a conclusive analysis of reservoir characteristics, economic value, and level of risk to a big E&P operator.

Data Sheet

Halliburton Otis® R® and RN® Landing nipples and Lock mandrels

Halliburton Otis R® landing nipples are selective by running tool and are run in the well on the completion tubing to provide a specific landing location for subsurface flow control equipment.

Case Study

Custom chemistry improves production in Permian Basin region

In the Permian region, Halliburton worked with a Midland Basin operator to improve production with only minor changes to the fracture design and operations.

Data Sheet

BaraMesh® shale shaker screens - Data sheet

BaraMesh screens incorporate a larger wire diameter than conventional shaker screens, offering more resistance to wear and helping increase screen life

Data Sheet

DuraSleeve® Sliding Side-Door® Circulation and Production Sleeve

The DuraSleeve® Sliding Side-Door® circulation and production sleeve is a full opening device with an inner sleeve that can be repeatedly opened and closed to gain communication between the tubing/casing annulus.

Case Study

BaraECD® non-aqueous fluid system helps customer reach reservoir - Case study

BaraECD system achieves operator's objectives and extends access to additional areas of reservoir, allowing for more directional drilling

Case Study

BaraMesh® shaker screens outperform competitor

Discover how BaraMesh screens reduced the operator’s overall screen costs by 30 percent per well with estimated savings of USD 2K per well on screens alone.

Data Sheet

BaraKlean - Data sheet

Surfactant solution used for surface cleaning applications. Used to remove water and oil-based mud residues from pits, tanks, circulating lines and manifolds

Case Study

eMotion®-LV barrier valve saves 29 hours of rig time

Unfold how Halliburton's completion tools successfully eliminate interventions during packer-setting operations with eMotion-LV barrier, valve saving rig time.

Case Study

Halliburton Offers Large-Bore Electro-Hydraulic (EH) Subsea Test Tree (SSTT) Package to Improve Multi-Well Campaign in GoM

An operator was challenged to continue with the same level of electro-hydraulic subsea test tree capability on a significantly reduced budget concurrent with the industry downturn.

Results per page: 102550