Search

Discover resources from Halliburton

Showing 1-10 of 228 results

Results per page: 102550
Filtered results

Data Sheet

BaraKlean - Data sheet

Surfactant solution used for surface cleaning applications. Used to remove water and oil-based mud residues from pits, tanks, circulating lines and manifolds

Case Study

Custom chemistry improves production in Permian Basin region

In the Permian region, Halliburton worked with a Midland Basin operator to improve production with only minor changes to the fracture design and operations.

Case Study

BaraMesh® shaker screens outperform competitor

Discover how BaraMesh screens reduced the operator’s overall screen costs by 30 percent per well with estimated savings of USD 2K per well on screens alone.

Case Study

eMotion®-LV barrier valve saves 29 hours of rig time

Unfold how Halliburton's completion tools successfully eliminate interventions during packer-setting operations with eMotion-LV barrier, valve saving rig time.

Case Study

Halliburton Offers Large-Bore Electro-Hydraulic (EH) Subsea Test Tree (SSTT) Package to Improve Multi-Well Campaign in GoM

An operator was challenged to continue with the same level of electro-hydraulic subsea test tree capability on a significantly reduced budget concurrent with the industry downturn.

Case Study

BaraDrilN™ X fluid helps customer achieve well testing operation - Case study

Enabling operational efficiency and cost savings with BaraDrilN-X, a high-performance, high-stability, water-based HPHT completion fluid

Data Sheet

LiquiLite™ Cement Additive

Simplified offshore operations by eliminating bulk blending, reducing costs, and customizing slurry density.

Case Study

Offshore rigless wireline intervention solution adds 4,000 BOPD with zero water production

Efficient rigless wireline intervention revives offshore Egypt well production, adding 4,000 BOPD and zero water production.

Case Study

Integrated well intervention vessel in Malaysia

Discover how Halliburton's Integrated Well Intervention Vessel (IWIV) slashes gravel-packing time in Malaysia, saving the operator an estimated USD 300K.

Case Study

Illusion® frac plug helps provide optimum zonal isolation

Operator from Deleware gains over $51 million USD in production as a result of implementing the Illusion® Frac Plug to work on optimal zonal isolation.

Results per page: 102550