Case Study
Reducing well time by 1.5 days drilling 12¼-inch hole
Discover how Halliburton reduced drilling time by roughly 1.5 days in a challenging 12¼-inch hole section using Geo-Pilot® 9600 XL RSS in Eastern Louisiana.
Discover the most up-to-date case studies, brochures, data sheets, and other resources from Halliburton