Search

Discover resources from Halliburton

Showing 1-10 of 228 results

Results per page: 102550
Filtered results

Article

Engineered solutions for smarter completions - Article

Halliburton Completion Tools explains how behind-casing monitoring can offer a new perspective on the reservoir

Case Study

Identifying damaging and performance-hindering vibrations

Cerebro® electronic data capture at the drill bit mitigates stick-slip, while improving ROP and drill bit conditions, allowing drill to kick-off point in 1 run.

Case Study

BaraMesh Shaker Screens saves operator over 50% on costs

Operator significantly cuts costs per well by replacing original equipment manufacturer (OEM) screens with high-performance option in the Permian Basin.

Data Sheet

BaraG-Force™ Centrifuges - Data sheet

Designed to process high volumes at high G-forces to optimize drilling fluid performance while simplifying installation, operation and maintenance

Case Study

BaraXcel™ fluid and optimized SCE systems help set records in Marcellus extended laterals - Case study

High-performance fluid and solids control systems deliver lower pump pressures and high ROPs while minimizing LGS concentration.

Data Sheet

Commander™ full bore - Data sheet

The Halliburton Commander Full Bore cement head is designed specifically to help improve barrier coverage and effectiveness

Book

2018 Annual & Sustainability Report

The 2018 Annual & Sustainability Report demonstrates Halliburton's execution of strategic priorities, sustainability commitments, and our value proposition.

Case Study

Fas Drill ultra frac plugs reduce millout time and save cost

Discover how the installation of Fas Drill® Ultra composite frac plugs reduces the millout time and delivers significant cost savings for the operator.

Data Sheet

Finished fuel additives technology - Data sheet

Broad selection of additives along with experienced people, equipment, and support services to help ensure timely and successful results

Case Study

Water conformance tools add 1 MMscf/d to production without additional water - Case study

Halliburton's water conformance tools boost production with no added water in Alaska well, resulting in opening a previously closed sleeve

Results per page: 102550