Search

Discover resources from Halliburton

Showing 1-10 of 228 results

Results per page: 102550
Filtered results

Case Study

Production facility in south Nigeria fast tracks production

Halliburton constructed and is currently operating and maintaining its first EPF in Nigeria- Operator cash flow increases from remote swamp in the Niger Delta.

Article

Helping to Solve Well Integrity Management Challenges for BAPETCO

This article describes one powerful example of digitalization applied by Badr El Din Petroleum Company or BAPETCO to enhance the WIM processes and regulatory compliance.

View

Data Sheet

Cognitus™ Automated Cementing Platform

Remotely controlled, autonomous offshore cementing for operational efficiency and consistency.

Data Sheet

GasVault™ Float Valves - Data Sheet

The Halliburton GasVault™ float valves provide a gas tight mechanical barrier designed for a safer wet-shoe track.

Case Study

Operator uses drilling fluid to optimize wellbore stability

Performadril®'s water based system delivers a superior shale inhibition in Nahr Umr and Laffan located formations and saves approximately $1.5 million.

Article

Corporate policy: Services of Independent Public Accountants

Ensures the independence of the Principal Independent Public Accountants, prohibits certain services, and mandates preapproval by the Audit Committee.

Case Study

SandRight® fallback preventer survives 3 frac hits

765-day run pulled due to production drop; despite solids, top pump passes inspection in Permian Basin wells which face corrosion, erosion, and frequent shutdowns.

Case Study

SandRight solids fallback preventer improves run life

Operating expenses and deferred production were significantly reduced on three wells, improving the overall run life more than 380% in the Middle East.

Case Study

Intelevate™ remote optimization reduces technician visits

A customer uses Summit’s Intelevate service to remotely optimize roughly one-third of their Permian Basin ESP operations in both New Mexico and Texas.

Case Study

Rapid response GeoESP solution saves geothermal operator cost

Geothermal well implemented a single, wider operating range GeoESP. Halliburton's Summit ESP® saved the German operator approximately six months of downtime.

Results per page: 102550