Case Study

Intelevate™ real-time ML optimizes GeoESP® performance

24/7/365 monitoring and early potential problem detection offer mitigation opportunities to extend run life.

Case Study

Operator installs 150+ SandRight® fallback preventers with zero sand fallback failures

732-day run pulled with all pumps passing API inspection saves $900K in expenses for operation in highly abrasive, corrosive wellbore environment in West Texas

Case Study

FireStorm® achieves 1,000+ day run-life milestone in SAGD well - Case study

Installed in an incredibly challenging Alberta SAGD well, the FireStorm ESP system has proven its resilience and capabilities with a 1,000+ day run life

Case Study

Summit ESP® recommends lowering ESP into tangent, revenue increases +$31K/day

The team recommended lowering the system to the tangent without pulling the well or changing out equipment, adding about $31,000/day in production revenue.

Case Study

Hercules™ HPS expands water injection capacity by 3x

Discover how comprehensive collaboration delivered an efficient, scalable system with minimal capital expense in half the time of alternative solution.

Case Study

SandRight® fallback preventer survives 3 frac hits

765-day run pulled due to production drop; despite solids, top pump passes inspection in Permian Basin wells which face corrosion, erosion, and frequent shutdowns.

Case Study

Rapid response GeoESP solution saves geothermal operator cost

Geothermal well implemented a single, wider operating range GeoESP. Halliburton's Summit ESP® saved the German operator approximately six months of downtime.

Case Study

Intelevate improves proportional integral deriviative (PID) uptime

Discover how Halliburton Intelevate team remotely optimized PID mode of operation where the VFD alters its speed to stabilize the system based on a set target.

Case Study

SandRight solids fallback preventer improves run life

Operating expenses and deferred production were significantly reduced on three wells, improving the overall run life more than 380% in the Middle East.

Case Study

Single GeoESP® offers wider operating range and energy savings

The application was redesigned with one GeoESP, which had a wider operating range and covered both wells at half of the cost to the customer in Germany.