Search

Discover resources from Halliburton

Showing 1-10 of 228 results

Results per page: 102550
Filtered results

Case Study

Operator increases ESP run life over 442%

SandRight Solids Fallback Preventer keeps reservoir sand from re-entering the ESP system during shutdowns and reduces risk of cable damage during installation.

Case Study

Operator drills sour formation safely with BaraXcel® Fluid

Engineered BaraXcel NAF system combined with the effective SOURSCAV scavenger proved to be key success factors in the safe delivery of this critical interval.

Case Study

RapidStart® Initiator CT Sleeves open after 5 Years

Despite 5 Years of Harsh Downhole Environments, Halliburton Rapidstart® Initiator CT Sleeves Continued to Provide Reliable Results in Northeast United States.

Case Study

Operator saves rig time with remotely operated barrier valve

TengizChevroil LLP (TCO) asked Halliburton to set a liner hanger in lower completion, without risking pumping ball to seat through horizontal section.

Case Study

SentinelCem™ Cement cures losses in well offshore Malaysia

Halliburton proposed the use of SentinelCem cement, which is a lost-circulation system designed to help mitigate severe losses and achieve zonal isolation.

Case Study

Injectrol® non-water-based conformance service

Pressure integrity test showed total zonal isolation at the first attempt. Well located in Bakersfield, California is currently producing from lower zones.

Brochure

Halliburton Surface Data Logging (SDL) - Brochure

Surface data logging services ensure you get the best most accurate information from your well, so you make better drilling and geological decisions, faster.

Case Study

Integration drives performance and accelerates learning curve

Halliburton Project Management achieves new benchmarks in post-salt and salt sections, achieving record-breaking improvement in ROP in 28in riserless section.

Case Study

Operator’s saltwater influx strategy saves USD 250K

BaraXcel™ fluid system withstands massive saltwater influx, allowing operator to successfully complete the intermediate section with zero of rig time.

Case Study

Over $3MM savings achieved using Hydra-Blast® pro service

Disocver how Hydra-Blast pro service was used for the plugging of a 13,000 ft well due to the accumulation of water production and acid insoluable scale.

Results per page: 102550