Search

Discover resources from Halliburton

Showing 1-10 of 228 results

Results per page: 102550
Filtered results

Case Study

Summit ESP® customer service delivers in harsh condition installation

Logistical planning grows imperative in the facing of harsh conditions with remote locations, making the mistakes incredibly costly in the field of work.

Case Study

Operator drills Argentina’s longest lateral and deepest well

Halliburton's iCruise intelligent rotary steerable system helps reach total depth and places well 100 percent in-zone in just one run in Vaca Muerta Reservoir.

Data Sheet

iCruise® intelligent rotary steerable system - Data sheet

iCruise is engineered with some of the highest mechanical specifications on the market, helping operators reduce well time and maximize the rate of penetration.

White Paper

Record breaking optimization results in Oman - White paper

Halliburton Project Management achieved a new field record in Oman through innovative drilling optimization methods, enhancing efficiency and productivity.

Case Study

Integration drives performance and accelerates learning curve

Halliburton Project Management achieves new benchmarks in post-salt and salt sections, achieving record-breaking improvement in ROP in 28in riserless section.

Case Study

Use of remotely operated technology saves 59 hours rig time

The use of eMotion-LV valve and Evo RED bridge plug saved an operator in the North Sea approximately 59 hours rig time compared to typical intervention methods.

Brochure

MineESP™ submersible borehole and surface pumps - Brochure

MineESP™ submersible borehole and surface pumps deliver the expertise, reliable technology, and service excellence needed to control groundwater inflows.

Case Study

Reservoir fluids and sand control operation cut costs

The BaraXcel™, BaraKlean, and BARACARB integrated reservoir fluids were meticulously chosen for this operation, enabling the well to be drilled in record time.

Case Study

FE program helps client discover more than 400 feet of pay

A Gulf of Mexico operator obtains high-quality formation evaluation, rotary cores, pressues, and fluid samples in deepwater wellbores with Halliburton.

Case Study

MaxFire® EFS performs after lightning strikes derrick

The MaxFire® system is a cutting-edge solution saving approximately USD 2.2 million in rig time thanks to its advanced features and seamless integration.

Results per page: 102550