Search

Discover resources from Halliburton

Showing 1-10 of 228 results

Results per page: 102550
Filtered results

Case Study

Sand management tool eliminates ESP system blockage

SandRight® solids fallback preventer stops dislodged sands from entering the ESP system, ensuring steady production and reservoir pressure in Ecuadorian wells.

Case Study

Multilateral Installations: paying dividends for two decades

Over 300 FlexRite multilateral system junctions have been installed in North Sea deepwater wells since 2001, evolving from dual-laterals to tri-lateral completions.

Case Study

Innovative application of CO2 injection boosts production

Innovative CO2 injection with Halliburton boosts mature field production and supports carbon capture and storage in the Rocky Mountains region.

Case Study

Intercept retrievable bridge plug provides V0 barrier

Discover how Halliburton's retrievable bridge plugs ensure stability and safety in North Sea, Offshore Norway, achieving successful installation and retrieval.

Case Study

Early production facility supports Aullador-1 oil well

Engineered solution works to deliver efficent impementation of modular EPF layout while using the existing equipment and running four years of zero NPT.

Case Study

Operator saves with Geo-Pilot® XL RSS and underreamer

$500,000 USD and 61 hours saved using Geo-Pilot xl rss combined with underreamer engineered solution in a heterogenus formation to reduce the well time.

Case Study

Norway: Intercept® RBP retrieved after 9 months in wellbore

Halliburton had been delivering Intercept® retrievable bridge plugs (RBPs) on a regular basis to a major operator in the North Sea, providing gas-tight barrier.

Case Study

RapidSuite® systems activate 2 years after installation-cs

100% zonal isolation was achieved in all 17 stages with Halliburton's RapidSuite® Multistage Fracturing Completion Systems in the Middle Eastern region.

Case Study

Operator navigates casing limitation to save productive zone

More than 300 FlexRite multilateral system junctions have been installed in deepwater North Sea wells allowing for 35% lateral length to be recovered.

Case Study

Halliburton makes splash in deep water saving USD 1.2M

Halliburton's unique integrated solution successfully acquires all required data safely and efficiently, while minimizing HSE exposure and operating expenses.

Results per page: 102550