Search

Discover resources from Halliburton

Showing 1-10 of 228 results

Results per page: 102550
Filtered results

Case Study

Operator switches to summit pump and thrust chamber

Retrofitted horizontal pumping equipment resolves gas plant start-up issues, improving pump efficency and saving downtime cost in the Powder-River Basin, WY.

Case Study

Swift energy and Saka Energi Indonesia use CobraMax® DM service

Swift energy and saka energi indonesia successfully utilize cobramax dm completion service to overcome wellbore restriction multistage stimulation process.

Case Study

Resevoir understanding improved by operator understanding and analysis

Discover how Halliburton's in-depth representation of fluid distribution leads to more productive drilling for up to 20% increased reservoir recovery.

Case Study

Innovation in MVCD improves cuttings treatmrny and waste management in five-well trial

MVCD system saves helps an operator save ~USD 373k by recovering 2,242 bbl drilling fluid and lowers cost for wet cuttings haul-off and final treatment.

Case Study

Operator uses custom WBF for formation evaulation program

BaraFLC W-950 fluid system maintains stable properties exposed to 185 degrees F NHT for an extended static period of time for seven days helping formation eval.

Case Study

PetroGuard Openhole Shunt system ensures gravel-pack success

Halliburton's PetroGuard Openhole shunt system in Myanmar ensures a gravel-pack success for the TOTAL's 4 well batch completion in the production's efficency.

Case Study

SentinelCem™ solves the losses in Iraq

Halliburton's SentinelCem cement achieves major success in curing lost circulation issues in Iraq with Halliburton saving operator millions of dollars annually.

Case Study

Operator saves valuable time during challenging stimulation

RapidSuite frac sleeve systems, including RapidStage® frac systems as well as RapidStart® initiator sleeves, were installed in each lateral in Kazakhstan.

Case Study

Record-setting lateral completion with Obsidian Plugs

Discover how Halliburton and eclipse resources set 124 frac plugs averaging roughly 5.3 frac stages per day in Eclipse Purple Hayes 1H Well, Utica Shale.

Case Study

SandTrap® service in North Africa – solids productions

Unwanted solids treatment on a well in North Africa shut-in due to sand production with Halliburton's SandTrap ABC service was deployed at 50 gal/ft (foamed)

Results per page: 102550