Search

Discover resources from Halliburton

Showing 1-10 of 228 results

Results per page: 102550
Filtered results

Operator Achieves 100% In-Zone Well Placement in Complex Structural Geology

Brazil: Direct Displacement Using BaraKlean® Casing Cleaner and CFG™ Modeling Saves 10 Hours on Deepwater Operation

CleanWell® Technology Saves $1.6 Million on Two Wells

Halliburton Technology Helps Identify Annular Shale Barriers for P&A Operations

Intercept® Retrievable Bridge Plug Data Sheet

Halliburton Makes Splash in Deep Water — Saving Operator USD 1.2 Million in Rig Time

Operator Reduces Ellipse of Uncertainty by 600%

CALIBRSM and SandWedge® Services Reduce Sand Flowback

Customized Kill Mud Enables Operator to Abandon Well Ahead of Time, Saving USD 1 Million

ExpressSand Delivery System - Data Sheet

Results per page: 102550