Search

Discover resources from Halliburton

Showing 1-10 of 228 results

Results per page: 102550
Filtered results

Data Sheet

GasFact™ isotopic gas analysis - Data sheet

Real-time isotopic gas analysis for fluid characterization, finger printing and analysis for rapid, reliable hydrocarbon characterization

Case Study

First GeoTap® IDS samples collected for customer in Norway

Discover how Halliburton's GeoTap IDS with iCruise and LWD triple combo accomplishes pressure testing and fluid sampling to assess formation properties.

Data Sheet

ResiStar® compensated resistivity measurements - Data sheet

ResiStar provides multi-frequency, compensated measurements with downhole environmental corrections for accurate resistivity in all drilling environments.

Case Study

Halliburton helps client to deliver savings on P&A project

Unfold how the Multi-PSL team delivers a large P&A project ahead of schedule, in turn, producing savied time and saved money in Eastern Canadian region.

Case Study

Halliburton drills fastest directional well in Napo Basin

A client in Ecuador turned to Halliburton to perform its 2016–2017 drilling campaign to maintain production in the Napo Basin, optimizing drilling time.

Case Study

Halliburton increases production in HP/HT, high-H2S field

Halliburton was awarded a multi-service contract from an independent oil company to provide Light Well Intervention Services (LWIS) in the Caspian Sea.

Data Sheet

CoreVault® rock-fluid-pressure - Data sheet

Next-generation reservoir evaluation technology that targets exploration, mature and unconventional reservoirs

Case Study

Combined EarthStar and ADR service geosteer in thin oil sand

EarthStar® and ADR™ services for geosteering in thin oil sand enabled operator to place 1,982 ft in oil pay, realizing an incremental ~USD 310,000 revenue.

Case Study

Collaborative services solve P&A project's time and costs

Discover how Halliburton's UK team completes 13 well plug and abandonment projects approximately $36M USD under budget and 126 days ahead of schedule.

Case Study

130 successful junction construction operations deployed

Real-time completion orientation using the workstring orientation tool maintains through-bore access and minimizes rig floor handling in the North Sea.

Results per page: 102550