Search

Discover resources from Halliburton

Showing 1-10 of 228 results

Results per page: 102550
Filtered results

Data Sheet

ExpressFiber™ disposable fiber cable - Data sheet

ExpressFiber™ disposable fiber cable is an economic, low-risk fiber solution for cross-well monitoring

Case Study

Single-trip strategy ensures water conformance in reservoir

Discover how Halliburton's data acquisition program helps identify communication with higher-pressure, water-bearing zone with a single trip deployment.

Data Sheet

H2S Scavengers - Data sheet

Athlon, a Halliburton Service, offers a full suite of H2S Scavenger products and brings significant experience treating H2S.

Case Study

AccessAcid® Stimulation Service - Case study

AccessAcid stimulation service combined with SPECTRUM® diagnostic service, to allow adjustment of the diverter design in real time.

Case Study

Succesful multi-well P&A campaign in the North Sea

Plug and Abondonment project for Halliburton called for Baramag® swarf seperation and recovery unit that allowed operator to succesfully operate and complete.

Data Sheet

DataSphere™ LinX® Monitoring System

The LinX monitoring system is a wireless through-wellbore technology that enables the placement of a permanent pressure/ temperature gauge behind the casing or liner in the cement, using electromagnetic power and communication to drive and communicate with sensors, without the need for batteries or extra barrier penetrations.

Data Sheet

DataSphere® LinX® monitoring system B-Annulus - Data sheet

The DataSphere® LinX® system is a step change in well integrity monitoring enabled by wireless through-casing power and communication

Data Sheet

Endurance Hydraulic Screen® - Data sheet

Endurance Hydraulic Screen® delivers a new level of sand control completion with full reservoir compliance and positive wellbore support

Data Sheet

HPET™ Halliburton Perforating Evaluation Tool - Data sheet

HPET captures actual dynamic reservoir response at multiple points throughout the perforation interval after the perforating event for "quick look data".

Case Study

Tiger Shark® II delivers 450 days of operation

View how Halliburton works with operators to draw down to the well and deliver the maximized well production of over 450 days of operation performance.

Results per page: 102550