Search

Discover resources from Halliburton

Showing 1-10 of 228 results

Results per page: 102550
Filtered results

Case Study

DuraHard® 7 coating provides enhanced protection against erosion and wear from frac sand - Case study

Maximized ESP system lifespan and efficiency in sand-heavy hydraulic fracturing with DuraHard® 7 coating. 475+ days of uninterrupted operation

Case Study

Solution reduces operator rig time during subsea completion

Discover how 9 5/8 inch intercept in well suspension offers API 11D1 V0 well barrier in the subsea removal offering a cost effective rig time for the operator.

Case Study

ClearCut makes successful cuts in pipe recovery operation

Neptune energy system hires on Halliburton to free stuck drillpipe with their Subsea wellhead/BOP in turn solving for nonproductive rigtime that was occuring.

Case Study

Solution reduces operator rig time during subsea completion

Temporary well suspension using Intercept® retrievable bridge plug provides American Petroleum Institute 11D1 V0 well barriers for subsea bop removal.

Article

Halliburton launches new IsoBond™ cement system

IsoBond reduces sustained casing pressure at its source to deliver a barrier that minimizes fluid loss, shortens transition time, and improves shear bonding.

Data Sheet

GasFact™ C1 to C8 gas chromatograph - Data sheet

Precise identification of reservior fluids for enchanced reservoir understanding.

Case Study

Automated continous circulation is mitigating downhole loss

Discover how Halliburton's E-cd™ device provided continuous circulation and hole cleaning during drillpipe connection process, reaching all planned section TDs.

Article

Rapidly Build Effective Reservoir Management Workflows

Optimize petroleum reservoir development with our cloud-based Full-Scale Asset Simulation, enhancing recovery strategies & reducing computational time.

View

Article

Automated Borehole Metadata Quality Management Using an AI approach

What if there is a way to fully automate the borehole metadata quality management process with tracking the confidence level of the system? What if the system not only learns from existing business KPIs but also integrates hidden patterns from the historical metadata?

View

Article

Maximize VSP Corridor Stack Usage for Well Tie in Seismic Analysis

This spotlight shows capability of the latest DecisionSpace® 365 Geosciences Suite, the Seismic Analysis software which enables the VSP corridor stack and the time-depth table to be conditioned and used for seismic-well calibration and seismic interpretation.

View
Results per page: 102550