Search

Discover resources from Halliburton

Showing 1-10 of 228 results

Results per page: 102550
Filtered results

Brochure

MineESP™ submersible borehole & surface pumps - Brochure

Summit ESP®’s MineESP™ submersible pumps excel in controlling groundwater inflows, minimizing downtime, and enhancing mine productivity in challenging environments.

Data Sheet

IsoGuard™ cement additive - Data sheet

Mitigating annular flow through unset cement achieved by providing excellent fluid loss control and shortening transition time, preventing unwanted flow paths.

Case Study

LO-Gard® service reduces lost circulation in plug cleanout

Halliburton recommended the LO-Gard service to help eliminate the loss of fluids into the wellbore to reduce cost and loss circulation for Permian operator.

Case Study

Operator increases drawdown in high oil cut and high GOR

High flow gas separator proves performance and economic value in multi-well pad field trial in Northwest Albreta, Canada after struggling with drawdown.

Data Sheet

SurgiFrac® NWB pinpoint stimulation service - Data Sheet

SurgiFrac NWB service removes damage within wellbore, penetrates existing fractures and creates new small/medium-sized fractures, enhancing reservoir performance.

Data Sheet

Spiral wrap string mill - Data sheet

CleanWell® Spiral Wrap String Mill is designed to restore casing drift and downsize debris generated during cased hole milling or drilling applications.

Case Study

Illusion Frac Plugs reduce post-fracturing treatment

An operator in the Williston Basin wanted to reduce or eliminate both the cost and the time associated with post-fracturing treatment millout operations.

Case Study

Operator mitigates high torque and drag with lubricant

The Halliburton BARALUBE® W-933 lubricant worked to make a cost effective, environmentally safe drilling area over 28,000ft in extended reach exploration well.

Case Study

Integrated solutions double run life for an operator

Halliburton Summit ESP® services help double ESP system run life for a North American operator to increase production by 20,000 BO per well and reduce downtime.

Case Study

Scale removal with Pulsonix® TFA in a geothermal well

The Pulsonix® TFA tool works to enable scale removal intervention which helps to enhance placement, removes obstructions and propagates acid in perforations.

Results per page: 102550