Search

Discover resources from Halliburton

Showing 1-10 of 228 results

Results per page: 102550
Filtered results

VersaFlex® Expandable Liner Hanger System Overcomes Pre-Salt and Fluid Loss Challenges

Fas Drill® Ultra Frac Plugs Reduce Time and Difficulty of Millout Operations

Single trip SPECTRUM® FUSION, SPECTRUM® 360 and PLT for Production Evaluation

Customer Uses Pressure Wave Technology in Blocked Pipeline

Operator Drills 6¾” Lateral in One Run, Sets New ROP Record

Engineered Completion Brine Significantly Reduces Costs in 48-Well P&A Project

Operator Eliminated NPT and Maintained Well Plan Trajectory

High Accuracy Leak Detection Performed on Entire Live Wellbore in RealTime Using Fiber-Optic Diagnostic-Capable Coiled Tubing

Operator Identifies Shallow Surface-Casing Corrosion Without Costly Workover

Savings over $3MM were benefited using Hydra-Blast® Pro Service on a well plugged with insoluble scale

Results per page: 102550