Search

Discover resources from Halliburton

Showing 1-10 of 228 results

Results per page: 102550
Filtered results

TOTAL S.A. Drills to Record Depths in HP/HT Well and Saves USD 5 Million

Operator Drills Record Setting Lateral in Midland Basin

Perforate, Wash, and Cement Option for Dual Casing Saves 66 Hours of Valuable Rig Time

H2Zero® Conformance Service – Case History 1

First Halliburton Dynamic Underbalance Perforating Job in Cameroon Achieves Customer’s Goals

ExpressKinect™ Wellhead Connection Unit Data Sheet

DuraHard™ Coatings Triple Pump Run Life in Extremely Abrasive Environment

Fas Drill® SVB packer pumps more than 2,500 barrels of cement at up to 6 bpm

UK Modern Slavery Act Statement

Slimline ESP System Achieves 400% Increase in Pressure Drawdown Compared to Gas Lift

Results per page: 102550