Search

Discover resources from Halliburton

Showing 1-10 of 228 results

Results per page: 102550
Filtered results

SandWedge® ABC Service – Case History

Subsea Flowline Hydrate Remediation

Improving Well Production with HydraJet and Targeted Acid Injection - Case Study

One-Run Mill-Out Sets Record for Operations in Colombia

Slimline ESP System Achieves 400% Increase in Pressure Drawdown Compared to Gas Lift Case Study

Cruzer™ Depth-of-Cut Rolling Element Greatly Reduces Curve Drilling Time

Through-Tubing Water Shutoff Solution Improves Well Productivity and Isolates Lower Water-Producing Zone

Operator saves USD 8.1 million, optimizes milling performance using PowerMag® casing magnet

Operator Optimizes Separation Factor on Multi-Well Pad with Precise, Accurate GWD Measurements

FS2 Fluid Loss Isolation Barrier Valves Contribute to Successful Completion on Deepwater Project

Results per page: 102550