Specific Challenge

Improve recovery from a series of shallow, low-pressure gas reservoirs

REGION - INDONESIA REGION - INDONESIA

Offshore Indonesia

REGION - INDONESIA

Challenge

Complex subsea development

  • Weak consolidated sands
  • Six target zones
  • Potential for early water breakthrough

Solution

Advanced completion solution comprising

  • ESTMZ system system to optimize operations and control sand production
  • ROC gauges and HS-ICVs to monitor and control each zone

Result

100% successful after five years of production

  • Successfully deployed ESTMZ system, which saved the operator 65 days for these nine wells
  • Exceeded expectations for gas flow rates
  • Significantly improved recovery by shutting in zones that produced excessive water
  • Enabled these wells to continue operating successfully for the next five years

Overview

A nine-well subsea development project was completed with Halliburton cased-hole frac packs for sand control and multizone intelligent completion technology to improve recovery from a series of shallow, low-pressure gas reservoirs offshore Indonesia for a major operator. The system was installed efficiently and operated flawlessly for five years. The combination of successful sand control and intelligent completions has significantly improved gas recovery without the need for rig intervention.

Challenge

The operator needed to improve operational efficiencies for this complex subsea field o fshallow, low-pressure, and weakly consolidated gas reservoirs. The field required a method to address the unconsolidated sands, along with the capability to monitor and control each potential layer, as the economics of the project required a single wellbore to access multiple reservoirs. Early water breakthrough was also a concern, with the potential impact of loading the production string with heavy water and curtailing ultimate recovery.

Solution

The Halliburton Enhanced Single-Trip Multizone (ESTMZ™) completion system was chosen for its ability to significantly improve operational efficiency. The system allows the sand control service tools and frac pack to be run in a single trip, and enables the intelligent completion system to be run inside the ESTMZ sand control system to monitor and control each reservoir. The Halliburton HS-ICVs (interval control valves) and ROC™ pressure and temperature gauges provided the operator the advantage of multi-rate testing and cleaning up each zone individually. The HS-ICVs were also used to permanently shut in several zones that produced excessive water that would have jeopardized recovery from offset zones.

34

different gas zones controlled

100%

successful after 5 years of production

65

operational days saved

Result

The ESTMZ frac-pack completion system was successfully deployed, which saved the operator 65 operational days over the nine subsea wells compared to the use of a conventional frac-pack system. The intelligent completion string was successfully drifted and set inside the ESTMZ system in each of the nine wells, which allowed zonal control of 34 different gas zones. The first well was a six-zone intelligent completion that was drifted and set through the lower completion frac pack, which was an industry first and a true union of intelligent completions with sand control systems. Four of the 34 HS-ICVs have been shut in to prevent water flow into the production string, which could lessen ultimate recovery of the entire field. After five years on production, the field gas flow rates are exceeding expectations, with no known sand control failures and each of the 34 HS-ICVs still fully operational.

Explore related products and services

Intelligent completions

Intelligent completions

Halliburton SmartWell® completion systems allow you to collect, transmit, and analyze completion, production, and reservoir data and control and monitor selected reservoir zones remotely and in real-time.

Explore
ESTMZ™ enhanced single-trip multizone system

ESTMZ™ enhanced single-trip multizone system

The ESTMZ system enables isolation, fracture stimulation, and treatment of multiple production zones in one trip.

Explore
HS interval control valves

HS interval control valves

The debris-tolerant HS interval control valve (HS-ICV) enables deployment of Halliburton SmartWell® systems in high-pressure, deepwater environments.