Search
Specific Challenge

Conformance Services for a horizontal wellbore

Challenge

  • Oil producer, carbonate reservoir 
  • Horizontal wellbore completed with multi-stage swell packers and RapidShift® sleeves (9 compartments)
  • Water production coming from the toe 
  • A bridge plug was installed just above the RRS#2, and had no effect on reducing water production

Solution

  • H₂Zero® and EquiSeal℠ NWB Conformance Services (deployed through 1 ¾˝ CT)

Result

  • Watercut was reduced from 37 to 12%
  • Well is currently producing on a larger choke size
  • 50% oil production increase

25%

Decrease in Watercut

50%

Increase in Oil Production