Search

Discover resources from Halliburton

Showing 1-10 of 228 results

Results per page: 102550
Filtered results

Article

The health, safety, and environment committee charter

Halliburton's health, safety and environment committee of the Board of Directors shall consist of at least three directors, all of whom shall be independent.

Brochure

2023 HALPAC Annual Report

Halliburton values the contributions of its dedicated employees, recognizing their impact not only to HALPAC but also in the communities where we live and work.

Brochure

Halliburton Project Management brochure

Halliburton project management delivers performance-based integrated solutions through collaborative engineering, project and risk management

Data Sheet

e-cd™ dual split circulating sub - Data sheet

The e-cd™ circulating device is an Eni-patented system used in MPD operations to enable continuous circulation and hole cleaning while making connections.

Case Study

Locating enhanced-permeability streaks in a carbonate reservoir

Identify seismically unresolved features in a producing carbonate field to deliver better cumulative production forecasting using an ensemble-based workflow .

Case Study

Modeling a complex turbidite reservoir

Creating consistent geological models with a solution that integrates geological and engineering understanding

Case Study

Improved volumes estimate by incorporating drill stem test data

Use static and dynamic data to better understand and estimate volumes for the Johan Sverdup Field

Case Study

Streamlined reservoir modeling reduces planning turn around

Integrated software tool brings speed, reliability and greater collaboration to reservoir modeling.

Case Study

Plug setting aid saves operator four days of rig time

Discover how the BHKA™ plug setting aid was used to place cement plug during a mature gas-well abdandonment operation to save more than USD 350K in rig costs.

Case Study

Corrosion-resistant cement solution for CO2 storage well

CorrosaLock™ and CorrosaCem™ cement systems successfully placed on production liner in CO2 storage well, maintaining full circulation throughout operation

Results per page: 102550